|
No.547 inside RPSI Whitehead's carriage
shed, new paintwork shining in the afternoon light. The carriage is now
sitting her on freshly overhauled bogies.
|
|
This will be the shop for crisps
and snacks. A scumble effect is being tried on the pvc panelling.
|
|
|
This will be the main seating area
of the dining car. The windows have been cleaned and refitted, and new
panelling has been fitted around them. Next will come seats and tables!
|
|
The extended bar approaches completion,
with a spare tap temporarily fitted to help visualise what it will look
like when completed.
|
|
|
Shunting engine No.3
"R H Smyth" was having some routine maintainance carried out. Here
the smokebox is being cleared of ashed and soot.
|
|
Hunslet No.102
"Falcon" was also being worked on. Currently work is centering on getting
the engine started.
|
|
|
This is one of No.461's
axleboxes. The axle fits through the circular hole in the centre of the
picture and the weight of the engine rests on the whitemetal bearings,
which have yet to be machined to shape.
|
|
Carriage No.62M's overhauled wheelsets
and axleboxes are being refitted. This coach is being overhauled before
it goes on loan to the Downpatrick
and County Down Railway.
|
|