GNR(I)
OPEN BRAKE THIRD 114
| Builders | GNR(I), Dundalk, 1940 |
| Withdrawn | CIÉ, early 1977 |
| Companies | GNR(I), CIÉ, RPSI |
| Preservation Career | Main line use from 1977 |
| Current Location | Whitehead |
| Current Status | In storage |
Modified in 1958 and fitted with a steam-heating boiler to run in a BUT (British United Traction) railcar set.
When it came to the RPSI the van area was modified to be a mobile workshop and storage area. It was felt then that there would be a need for 'out on the road' repairs.